It is carried from the floor level on a considerable steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or higher strength castable.
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]
The primary combustion chamber must ensure minimum exit temp is not less than 850? C.
Certification: NEMA (or other recognized) certificate
Quality/Environmental Standards: NEMA ACT (EMCA) 1999, BS3316
Thermal conductivity: 1.3W/mk
Hot face material:
Hearth and lower section of chamber walls
Operating period: anticipated daily operating period 8 hours
Burner: ordered for on/off operation
Capacity to support equipment: the agent/supplier shall have adequate facilities, spare parts, consumables and capable skilled technical staff.
Maximum rating: 450kW/hr
Maximum rating: 450kW/hr
Average consumption: 4.5Ltrs/hr
Insulation:
Limiting continuous service limitation 1000? C
Horizontal good hearth, refractory lined primary combustion chamber. Approx. Measurements 800x2100mm(DxL)
Chimney/Stack: Should be manufactured from refractory lined mild steel or higher quality air-cooled s/s.
Maximum consumption: 9Ltrs/hr
Thermal conductivity: 0.095W/mk
Manual loading door
Estimated ash residue: 5 — 10%
Super duty firebrick
Electrical supply: single phase: 220/240VAC; 50/60Hz
Documentation:
Chamber: should be refractory lined into the following standard;
Average consumption: 3Ltrs/hr
Nominal capacity: 50kg/hr batch load
Full sized bulk load/ash removal door
Afterburner:
Thickness: 25mm
Ash: The waste will be reduced by 90~95% to leave 10-5% ash
Medical waste incinerator for sale Operation manual: 2 sets
Training: the Agent shall conduct a two times incinerators training after installation and commissioning of the equipment.
The Agent shall conduct a two days operation & maintenance training to the Biomedical engineering personnel following installation & commissioning of the equipment.